Shift Information
Hr by Hr Production (Qty) — FT Production
| 1 Hr | 2 Hr | 3 Hr | 4 Hr | 5 Hr | 6 Hr | 7 Hr | 8 Hr | Total |
|---|---|---|---|---|---|---|---|---|
Down Time (mins) — If no WIP write NW
| 1 Hr | 2 Hr | 3 Hr | 4 Hr | 5 Hr | 6 Hr | 7 Hr | 8 Hr | Total |
|---|---|---|---|---|---|---|---|---|
WIP / Scrap
WIP Remaining (24hr · Trolley ct)
AM · 00–11
PM · 12–23
Scrap Qty
Is any Change Over (Yes / No)
TIM A
TIM B
Pv 804
Main / Standby
BH (1)
MainL
1D label
1D ribbon
BH (2)
5S — Previous Shift
NG parts found on line
Main label trash
Spillage of glue
Parts inside machine
NG Parts Left by Previous Shift (Qty)
NG Parts Left This Shift (Qty)
Major Downtime >20 mins (Machine DT only)
| From | To | Downtime | Problem | Action Taken |
|---|---|---|---|---|